Thursday, February 24, 2011

Buy Nisim Shampoo Calgary

offset pit part one



The first part of the offset pit is ready.
It was not easy to take in the self-built concrete ring in the pit. Three strong men, some bamboo and a few ratgebende women were needed. After about an hour sitting, the last thing in the pit.

The pipes to the toilet, we have already connected. Next to it there, we have also been another pit dug. A little smaller. There is the gray water, water from showers and sinks will be collected and treated in a stone filter already. Then it goes to the wetland, will take over where cattails and other plants, the rest of clarification. I'm on it to pull Cyprus grass. Have a friend get a few cuttings.

the way we prepare still the roof before. This means that we are in the preparatory work. The pillars should in fact be made of bamboo. Most already been treated, but still needs to be washed, painted and cut to the proper length is ...

0 comments:

Post a Comment