Sunday, November 16, 2008

Sonographic Appearance Lymph Node

Schläferstündchen

Schläferstündchen under "Lirio Thurs Breijo"


door guard Hanna


A summer between pure water days. Actually more of a "Hundstag", a very hot day. As the two ladies were especially busy to look for a shady spot. I also. I admit it. The welding I just ran down Sun

The wood for the little hut was delivered. No easy task. The road is now only prepared to part. I was not before but even this partial trust. Paulo can be tilted a few weeks ago just rubble on the muddy ground, claiming that this will be of "boards hard." It was not. After a few meters of the truck was stuck. Alessandro was horrified. "We have ruined the road and you're to blame," he angrily threw me on the head. Because of guilt. I still say the truck driver that the road is good and not to unload in front of goal because he is already gas. It took a little until the truck was released. A little longer it lasted until I had the wide-open driving grooves filled again with the already marginalized stones. Only at one point, I have to work a little bit, because where the biggest puddles caused by road and can be no question anymore.

The fact that the road is now partially ruined, I think, however not so bad. From the beginning, I said that it does not work, just to throw stones or grit to clay soil. The rainwater flows merrily through the stone layer through, accumulates on the compacted clay and hey presto, the shipping channel to the swimming channel, which also moves with little weight already on the page. My advice was therefore Gelautet beginning of that to take about 10 centimeters thick layer of clay or to create a drainage channel every few yards before a riprap is applied. To what women say, is here but is still less than in Germany. By the last episode they now have proof that their idea was not so good. Goofy is that cost us the story of two days. Half a day I was busy trying to correct the mishap a little. Then I helped Alessandro, carry the wood for the piece by piece to the property.



Because it is fresh wood, it has a lot of weight. We were able to supply only two boards or shoulder bars. The 500 meters to the property before I came here as some Kilomter. I think we have put at least two marathons back. 86 boards, 20 slats, 25 some four meters long bar, about 52 times the distance now and then run back. 982 steps down, 1453 serious steps back. Now it's almost done. The wood stock is set up. The bamboo camp also. Marcia has already given us a bit of bamboo. He was easier to bear. Although he is treated, whether or dried. To build a temporary Stadl but it's enough.



From tomorrow it will be easier. Not only because of the heavy transport eliminates foot. We have hired a helper. Renato. He lives in the area, worked as a carpenter and is now retired. A tall man with broad back and strong arms. Only briefly, I explained to him how I imagine the Holzhüttlein so and already he has started to plan when he will do something. Starting early in the morning, will he the same, he told me once before and sent to the shops. The sand that we had bought, was washed away by rain the past week. So you have new here, because without any concrete sand for the brick footings.

0 comments:

Post a Comment